Name: | Bridge over river Rēzekne in Rēzekne (Stacijas street) | |
Location: | Rēzekne, Stacijas street | |
Opening date: | 10.09.2010 | |
Client: | Rēzekne City Council | |
Contractor: | JSC “A.C.B.” | |
Design stage: | Detailed design | |
Design company: | JSC „Ceļuprojekts” | |
Design manager: | R. Maslovskis | |
Bridge type: | Four-span frame system | |
Total length: | 61 m | |
Span lengths: | 15 m + 24 m + 15 m |
Related posts: