Name: | Bridge over river Ogre in Glāzšķūnis | |
Location: | Road P8 Inciems – Sigulda – Ķegums (km 60.96) | |
Opening date: | 01.09.2004 | |
Client: | SJSC „Latvijas Autoceļu direkcija” | |
Contractor: | „Tilts” Ltd. | |
Design stage: | Detailed design | |
Design company: | JSC „Ceļuprojekts” | |
Design manager: | R. Maslovskis | |
Bridge type: | Four-span continuous beam bridge | |
Total length: | 90.56 m | |
Span lengths: | 3.5 m + 19.5 m + 22.14 m + 22.27 m | |
Related posts: