Bridge over Baltezers canal

Name: Bridge over Baltezers canal
Location: A1 motorway Rīga-Ainaži (km 3.7)
Opening date: 2000
Client: SJSC “Latvijas Autoceļu direkcija”
Contractor: “8. CBR” Ltd.
Design stage: Detailed design
Design company: JSC „Ceļuprojekts”
Design manager: P. Vilcāns
Bridge type: Steel-reinforced concrete continuous beam bridge
Total length: 46.2 m
Span lengths: 12 m + 22.2 m + 12 m

Related posts:

  1. Bridge over river Dubna in Rožupe
  2. Bridge over river Ogre in Glāzšķūnis
  3. Suspension footbridge over river Mēmele
  4. Cable-stayed bridge over River Daugava in Jēkabpils
  5. Footbridge over river Amata

Post a Comment

Your email is never published nor shared. Required fields are marked *

Ogļu termināls