Name: | Footbridge over river Amata | |
Location: | A2 motorway Riga-Sigulda-Estonian border near village Bille | |
Opening date: | 10.09.2004 | |
Client: | SJSC „Latvijas Autoceļu direkcija” | |
Contractor: | JSC „8 CBR” | |
Design stage: | Detailed design | |
Design company: | JSC „Ceļuprojekts” | |
Design manager: | A. Linde | |
Bridge type: | Steel arch bridge | |
Total length: | 38 m (span of the arch 34.34 m) | |
Span lengths: | 38 m |
Related posts: