Category Archives: CP 3D

Name: Southern bridge 2nd stage Location: Riga, Slāvu arterial junction Opening date: 2011 Client: Riga City Council Traffic department Contractor: JSC “Dienvidu tilts” Design stage: Detailed design Design company: JSC „Ceļuprojekts” Design manager: J. M. Leikarts Total length of carriageways: 3859 m Description coming soon

Name: Cable-stayed bridge over River Daugava in Jēkabpils Location: P32 road Viskāļi-Koknese (part of the E22 motorway) Opening date: – Client: Jēkabpils City Council Contractor: – Design stage: Preliminary design Design company: JSC „Ceļuprojekts” Design manager: J. Linde Bridge type: Cable-stayed bridge Total lenght: 420 m Span lenghts: 80 m + 260 m + 80 [...]

Name: Design, fabrication and erection of a steel foot bridge, St. Elmo, Valletta Location: Valletta, Malta Opening date: – Client: JSC “Transport Systems” Contractor: “Rīgas tilti” Ltd. Design stage: Detailed design (tender) Design company: JSC „Ceļuprojekts” Design manager: A. Linde Bridge type: Steel arch/truss bridge Total length: 70.8 m Span lengths: 35.4 m + 35.4 [...]

Ogļu termināls